Webinar - Maximizing Geothermal Incentives for ESCO Projects
Monday, September 28, 2026 (2:00 PM - 3:00 PM) (EDT)
Description
This session will provide details on how to maximize federal investment tax credits (ITC) for geothermal heating/cooling projects delivered through performance contracting. State/local/utility incentives will be included to illustrate how stacking geothermal incentives can increase project scope, decrease payback, improve cash flow and accelerate decarbonization. Updated Direct Pay/Elective Pay, prevailing wage, apprenticeship, domestic content and energy community requirements will be detailed. Determining geothermal viability through desktop review/indicative proposals for early phases of performance contracting will be reviewed. The progression of geothermal development during the investment grade audit (IGA) to a constructable firm fixed price net of incentives will be detailed. Attendees will understand requirements during construction, commissioning, measurement and verification (M&V) to ensure timely ITC credit or direct payment is received and audit-proof.
Presenters:
JC Caine, Sr. Director, Business Development, Brightcore Energy, Sam Chussid, Sales Engineer, Brightcore Energy, Josh Howes, Chief Executive Officer, Walker Blue
Learning Objectives:
- Identify the requirements for geothermal federal investment tax credits (ITC), State grants, and local utility incentives to increase project scope, improve ROI and shorten pay back. This includes prevailing wage & apprenticeship and domestic content requirements.
- Determine geothermal viability during preliminary assessment/RFQ/RFP Phases of an ESCO project. Develop ROM geothermal design options together with price & savings to accommodate building heating & cooling loads and the impact of federal ITC and local incentives on project cash flow.
- Identify the design and constructability details required to progress from a geothermal indicative proposal to developing a firm fixed price & savings included in an investment grade audit (IGA). This includes feasibility, test well, design, field measurements, and finalized geothermal solution net of federal ITC and local incentives.
- Understand the requirements during construction, commissioning, measurement & verification (M&V) to ensure the geothermal solution produces the guaranteed savings, secure the investment tax credits (ITC) or direct payment is received and audit-proof.
NAESCO has submitted this webinar to the AIA for 1 CEU approval.
NOTE: Beginning in 2023, all NAESCO webinars will be offered to all attendees at no cost. Recordings and slides will be available to members only, after the webinar.